Data center.

Permit planning, front-end and detailed design, BIM integration, site logistics, fire safety design, local regulation advice, modular growth strategies, evolutionary masterplanning, and futureproof design concepts. Full execution support through commissioning.

Start a project
Data center server hall with blue lighting
  • 40+ Years

    experience in high tech industrial expertise

  • 10+ Years

    in Data Center design and construction

  • 400 MW+

    of Data Center capacity completed

Project stages, end to end.

From concept to completion, every phase covered by one team.

01.

Site Selection

02.

Due Diligence

  1. Site Selection Client Support
  2. Due Diligence Management
  3. Legal Requirements Assessment & Methodology
  4. Environmental Impact Studies
03.

Master Planning

  1. Site Design Optimisation
  2. Environmental Approach
  3. Landscape and Visual Integration
  4. Well-Being Approach
04.

Permitting - BoD - Legal Compliance

  1. Localisation & Legal Requirements Assessment
  2. Landscape and Visual Integration
  3. Environmental Impact Studies
  4. Fire Regulation
Group Sigma's Added Values
05.

Detailed Design - DD

  1. Lead Design
  2. Design Development
  3. Fit-Out
  4. Fire Prevention
06.

Delivery Coordination & Compliance

  1. Construction Quality & Compliance
  2. Budget & Planning Management
  3. Fire Handover

What we deliver in each phase.

Each phase gathers two to four expert services. Click through to see the deliverables.

01 & 02.

Site Selection & Due Diligence

We provide integrated support in assessing site-specific liabilities, environmental impacts, adherence to authority requirements, and technical studies required to mitigate operational and environmental risks.

Site selection illustration

Site Selection

Site Utilities & Infrastructure Analysis : a thorough evaluation of available services, including :

  • Electricity : grid connection and load capacity.
  • Water : access to mains water and drainage systems.
  • Fiber Optic : high-speed internet connectivity and digital infrastructure.
03.

Master Planning

Our approach to masterplanning balances industrial density with land optimisation, utilising a phased, flexible framework that allows the site to evolve.

Site design optimisation

Site Design Optimisation

We prioritise smart growth and adaptive planning through a phased approach. Our design is a flexible, ongoing process that allows the site to expand and evolve over time, using modular elements to adapt as needs change.

  • Strategic land-use optimisation
  • Smart growth and industrial density
  • Modular design and scalable architecture (phasing)
  • Physical security
  • Traffic study : flows, connections and safety
  • Aesthetic integration and architectural branding
04.

Permit Application & Code Compliance

Bridging the gap between global design and local regulations. Group Sigma delivers a decisive strategic advantage by streamlining the complex permitting process.

Localisation and legal requirements

Localisation & Legal Requirements Assessment

  • Liaison with Authorities : municipal departments and planning boards.
  • Urban Feasibility Studies : zoning laws, setbacks, land-use constraints.
  • Integrated Application Strategy
05.

Architecture & Development Design

Flexible and integrated architecture that balances high-performance fire safety with smart cost optimisation, through seamless multi-disciplinary collaboration.

Lead design

Lead Design

  • Client point of contact
  • Design team coordination
  • Design schedule management
  • Design cost management
06.

Delivery Coordination & Compliance

In our role as project architect and the client's trusted partner, Group Sigma oversees the coordination of all construction facets. We serve as a dedicated extension of the client team, managing site inspections and ensuring technical excellence throughout.

Construction quality and compliance

Construction Quality & Compliance

During the construction phase, Group Sigma's role is to assess the quality and compliance of the CSA execution works through regular site inspections.

  • Local Code Standards : well-being at work code, Royal Decree of 07/07/1994 (Appendixes 1, 2/1, 5/1, 6, 7), local standards
  • Permitting requirements (including Fire Report)
  • Design requirements

Fire prevention, built into the design from day one.

Group Sigma specialises in passive fire protection for high-tech buildings and data centers. Each strategy is analysed and optimised for security and cost-efficiency.

Read about fire prevention

Your Architect Partner in Data Center Building.

Ready when you are.